Anti-Flooding Work to Start

Persistent problems at two of Orihuela Costa’s flooding blackspots are about to be solved by the council. The infrastructure department is arranging for the storm drain network to be renovated and extended along Calle Mariano in Torregrosa and the San Miguel Road between Villa Costa and Las Filipinas urbanisations. This should stop water pooling in the roads during heavy rains. 

Skip to content